//]]>

Online Scheduling in Manufacturing (Record no. 10492)

000 -LEADER
fixed length control field 03251nam a22003975i 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20140310143335.0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field cr nn 008mamaa
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 121026s2013 xxk| s |||| 0|eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781447145615
978-1-4471-4561-5
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.5
Edition number 23
264 #1 -
-- London :
-- Springer London :
-- Imprint: Springer,
-- 2013.
912 ## -
-- ZDB-2-ENG
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Suwa, Haruhiko.
Relator term author.
245 10 - IMMEDIATE SOURCE OF ACQUISITION NOTE
Title Online Scheduling in Manufacturing
Medium [electronic resource] :
Remainder of title A Cumulative Delay Approach /
Statement of responsibility, etc by Haruhiko Suwa, Hiroaki Sandoh.
300 ## - PHYSICAL DESCRIPTION
Extent IX, 156 p. 72 illus.
Other physical details online resource.
505 0# - FORMATTED CONTENTS NOTE
Formatted contents note Scheduling Strategies Coping with Uncertainty -- When-to-Schedule Policy Using Cumulative Delay -- Cumulative Delay Based Periodic Rescheduling -- Cumulative Delay Based Reactive Scheduling -- Hybrid When-to-Schedule Policies with Cumulative Delay -- Discussions -- Conclusions.
520 ## - SUMMARY, ETC.
Summary, etc Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the practical decision-making: 1. To reduce frequent schedule revisions which do not necessarily improve a current situation with much expense for its operation; 2. To avoid overreacting to disturbances dependent on strongly an individual shop floor circumstance; and 3. To simplify the monitoring process of a schedule status. Online Scheduling in Manufacturing will be of interest to both practitioners and researchers who work in planning and scheduling in manufacturing. Readers will find the importance of when-to-revise policies during a schedule execution and their influences on scheduling results.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Engineering.
Topical term or geographic name as entry element Engineering economy.
Topical term or geographic name as entry element Engineering.
Topical term or geographic name as entry element Engineering Economics, Organization, Logistics, Marketing.
Topical term or geographic name as entry element Production/Logistics/Supply Chain Management.
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Sandoh, Hiroaki.
Relator term author.
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element SpringerLink (Online service)
773 0# - HOST ITEM ENTRY
Title Springer eBooks
776 08 - ADDITIONAL PHYSICAL FORM ENTRY
Display text Printed edition:
International Standard Book Number 9781447145608
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier http://dx.doi.org/10.1007/978-1-4471-4561-5
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Item type E-Book
Copies
Price effective from Permanent location Date last seen Not for loan Date acquired Source of classification or shelving scheme Koha item type Damaged status Lost status Withdrawn status Current location Full call number
2014-03-29AUM Main Library2014-03-29 2014-03-29 E-Book   AUM Main Library658.5

Languages: 
English |
العربية