000 -LEADER |
fixed length control field |
03141nam a22003855i 4500 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
OSt |
005 - DATE AND TIME OF LATEST TRANSACTION |
control field |
20140310152714.0 |
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION |
fixed length control field |
cr nn 008mamaa |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
130514s2013 gw | s |||| 0|eng d |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
International Standard Book Number |
9783658020897 |
|
978-3-658-02089-7 |
050 #4 - LIBRARY OF CONGRESS CALL NUMBER |
Classification number |
HB71-74 |
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER |
Classification number |
330 |
Edition number |
23 |
264 #1 - |
-- |
Wiesbaden : |
-- |
Springer Fachmedien Wiesbaden : |
-- |
Imprint: Springer Gabler, |
-- |
2013. |
912 ## - |
-- |
ZDB-2-SBE |
100 1# - MAIN ENTRY--PERSONAL NAME |
Personal name |
Seeanner, Florian. |
Relator term |
author. |
245 10 - IMMEDIATE SOURCE OF ACQUISITION NOTE |
Title |
Multi-Stage Simultaneous Lot-Sizing and Scheduling |
Medium |
[electronic resource] : |
Remainder of title |
Planning of Flow Lines with Shifting Bottlenecks / |
Statement of responsibility, etc |
by Florian Seeanner. |
300 ## - PHYSICAL DESCRIPTION |
Extent |
XXVI, 182 p. 68 illus. |
Other physical details |
online resource. |
440 1# - SERIES STATEMENT/ADDED ENTRY--TITLE |
Title |
Produktion und Logistik |
505 0# - FORMATTED CONTENTS NOTE |
Formatted contents note |
Simultaneous Lot-Sizing and Scheduling for flowline production systems -- General Lot-Sizing and Scheduling Problem for Multiple production Stages -- Model reformulation & Heuristics. |
520 ## - SUMMARY, ETC. |
Summary, etc |
In the consumer packaged goods industry, usually a large number of final items are produced in a highly automated flow line production system. Florian Seeanner presents a mathematical model which is an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) to tackle the problem of shifting bottlenecks. Especially, a new meta-heuristic is developed which combines the principles of Variable Neighborhood Decomposition Search (VNDS) and Exchange. This VNDS+E heuristic is able to find very good solutions for the improved GLSPMS, including a real-world problem case. Finally, further model extensions, e.g., for scarce setup resources, are proposed. Contents · Simultaneous Lot-Sizing and Scheduling for Flow Line Production Systems · MIP Models and Heuristic Solution Procedures · Practical Application Target Groups · Researchers and students in the field of production planning · Executives in this area The Author Dr. Florian Seeanner wrote his dissertation under Prof. Dr. Herbert Meyr’s supervision at the Chair of Production and Supply Chain Management at the Technische Universität Darmstadt. The Editors The series Produktion und Logistik is edited by Prof. Dr. Bernhard Fleischmann, Prof. Dr. Martin Grunow, Prof. Dr. Hans-Otto Günther, Prof. Dr. Stefan Helber, Prof. Dr. Karl Inderfurth, Prof. Dr. Herbert Kopfer, Prof. Dr. Herbert Meyr, Prof. Dr. Thomas S. Spengler, Prof. Dr. Hartmut Stadtler, Prof. Dr. Horst Tempelmeier und Prof. Dr. Gerhard Wäscher. |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
Topical term or geographic name as entry element |
Economics. |
|
Topical term or geographic name as entry element |
Economics/Management Science. |
|
Topical term or geographic name as entry element |
Economics/Management Science, general. |
710 2# - ADDED ENTRY--CORPORATE NAME |
Corporate name or jurisdiction name as entry element |
SpringerLink (Online service) |
773 0# - HOST ITEM ENTRY |
Title |
Springer eBooks |
776 08 - ADDITIONAL PHYSICAL FORM ENTRY |
Display text |
Printed edition: |
International Standard Book Number |
9783658020880 |
856 40 - ELECTRONIC LOCATION AND ACCESS |
Uniform Resource Identifier |
http://dx.doi.org/10.1007/978-3-658-02089-7 |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Source of classification or shelving scheme |
|
Item type |
E-Book |