//]]>

The ultimate improvement cycle : (Record no. 3216)

000 -LEADER
fixed length control field 01744cam a2200265 a 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20190523124237.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 090123s2009 flua b 001 0 eng
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781420090345 (hardcover : alk. paper)
International Standard Book Number 1420090348 (hardcover : alk. paper)
041 ## - Language
Language code of text/sound track or separate title eng
050 00 - LIBRARY OF CONGRESS CALL NUMBER
Classification number HD38.5
Item number S634
082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.4013
Edition number 22
Item number S634
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Sproull, Robert.
9 (RLIN) 7762
245 14 - IMMEDIATE SOURCE OF ACQUISITION NOTE
Title The ultimate improvement cycle :
Remainder of title maximizing profits through the integration of lean, six sigma, and the theory of constraints /
Statement of responsibility, etc Bob Sproull.
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc Boca Raton, FL :
Name of publisher, distributor, etc CRC Press,
Date of publication, distribution, etc 2009.
300 ## - PHYSICAL DESCRIPTION
Extent xxxviii, 250 p. :
Other physical details ill. ;
Dimensions 24 cm.
500 ## - GENERAL NOTE
General note "A Productivity Press book."
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc Includes bibliographical references (p. 233-235) and index.
505 0# - FORMATTED CONTENTS NOTE
Formatted contents note The lean, six sigma, and theory of constraints (TOC) : improvement cycles -- Introducing the ultimate improvement cycle (UIC) -- The value stream, a scheduling system, and performance metrics -- Finding waste in the constraint -- Reducing variation and defects -- Exploiting the current constraint -- Reducing waste and variation in the current constraint -- Subordinating nonconstraints to the current constraint -- Line balancing and flow optimization -- Optimizing the constraint buffer and pulling in the nonconstraints -- Elevating the constraint and implementing protective controls -- Breaking the current constraint -- Sustaining the gains with protective controls -- System constraints and problems -- Establishing the environment for change.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Business logistics.
9 (RLIN) 25900
Topical term or geographic name as entry element Production management.
9 (RLIN) 1767
Topical term or geographic name as entry element Six sigma (Quality control standard)
9 (RLIN) 995
Topical term or geographic name as entry element Theory of constraints (Management)
9 (RLIN) 3301
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Item type Book
Copies
Price effective from Permanent location Date last seen Not for loan Date acquired Source of classification or shelving scheme Koha item type Lost status Cost, normal purchase price Withdrawn status Source of acquisition Cost, replacement price Damaged status Barcode Current location Public note Full call number
2011-11-27AUM Main Library2013-02-11 2013-02-11 Book 44.19 Jordan Book Centre33.15 AUM-011788AUM Main LibraryJBC/2011/16930658.4013 S634
2011-11-27AUM Main Library2013-02-11 2013-02-11 Book 44.19 Jordan Book Centre33.15 AUM-020729AUM Main LibraryJBC/2011/16930658.4013 S634