|
|
Location-based management for construction : , planning, scheduling and control /
by Kenley, Russell.
Publication:
London ; | New York : Spon Press, 2010
. xxx, 554 p. :
26 cm.
Date:2010
Availability:
Copies available:
AUM Main Library
(2),
|
|
|
Introduction to scheduling /
Publication:
Boca Raton, FL : CRC Press, 2010
. xx, 313 p. :
25 cm.
Date:2010
Availability:
Copies available:
AUM Main Library
(2),
|
|
|
Managing construction logistics /
by Sullivan, Gary,
Publication:
Chichester, England : Wiley-Blackwell, 2010
. xxvii, 275 p. :
25 cm.
Date:2010
Availability:
Copies available:
AUM Main Library
(2),
|
|
|
Stochastic scheduling /
by Sarin, Subhash Chander.
Publication:
Cambridge : Cambridge University Press, 2010
. xii, 191 p. :
27 cm.
Date:2010
Availability:
Copies available:
AUM Main Library
(2),
|
|
|
The supply chain in manufacturing, distribution, and transportation : , modeling, optimization, and applications /
Publication:
Boca Raton, FL : CRC Press, 2011
. xxiii, 306 p. :
25 cm.
Date:2011
Availability:
Copies available:
AUM Main Library
(2),
|
|
|
Construction project scheduling and control /
by Mubarak, Saleh A.
Publication:
Hoboken, N.J. : Wiley, 2010
. xvii, 456 p. :
25 cm.
Date:2010
Availability:
Copies available:
AUM Main Library
(2),
|
|
|
Managing flexible workforce : , people /
by Pettinger, Richard.
Publication:
Oxford : Capstone Pub., 2002
. 122 p. ;
18 cm.
Date:2002
Availability:
Copies available:
AUM Main Library
(3),
|
|
|
Maintenance scheduling in restructured power systems /
by Shahidehpour, M.,
Publication:
Norwell, MA : Kluwer Academic Publishers, 2000
. xxviii, 264 p. :
25 cm.
Date:2000
Availability:
Copies available:
AUM Main Library
(1),
|
|